Covered Autonomous Inflatable Regolith Node
A Mars habitat for six people: a soft pressure vessel, packed small for landing, inflated in a shallow pit and buried under a 1 m shell of kiln-sintered regolith blocks with a laser-glazed outer skin. Robots build it all before the crew arrive.
CAIRN-7 splits the two hardest jobs of a surface habitat between two materials. The inflatable vessel holds the air. The regolith shell stops radiation, micrometeoroids and the thermal swing, and is never asked to hold pressure.
Fabric vessels are one of the most mass-efficient ways to land a large pressurised volume: they launch folded and open to about twice their packed diameter (about 4.3 m packed to 8.7 m for the hub). TransHab's development and BEAM, flown to the ISS in 2016, show the restraint-and-bladder approach works7,8, and Sierra Space burst a full-scale expandable at 77 psi against a 60.8 psi requirement (tested December 2023, reported January 2024)9.
Shielding is the opposite problem: it is heavy, and it is already on Mars. A 1 m shell over the hub is about 390–440 t of material. Shielding an inflatable under a shell printed from local regolith is the idea ESA and Foster + Partners explored for a lunar base10; CAIRN-7 swaps their binder printing for kiln-sintered blocks and a laser-glazed outer skin.
Robots land first, a full launch window (26 months) ahead of the crew. They dig the shallow pits, lay the foundation rings, inflate the vessels, raise the shells around them and start making oxygen. The crew arrive to a base that is already pressurised, powered and producing.

The hub carries the shared life of the base on two decks. Six smaller pods sit on a ring around it, each joined to the hub by its own buried, sintered vault tunnel. One pod is the EVA node, with the walk-through airlock and suitports.
Plan, schematic, to scale. Pods at 30°, 90°, 150°, 210°, 270° and 330°, with the EVA node at 210°. Tunnel joints and hatches are simplified.
| Element | Size | Role |
|---|---|---|
| Hub | Ø 8.7 × 6.6 m about 347 m³ | Two decks: communal (galley, table for six, lounge, ops) and private (six cabins, wash unit, quiet nook). A rigid life-support core runs through both decks, with two stairways. |
| Pod D2 · Lab | Ø 4.0 × 3.3 m about 33 m³ | Sample analysis and sealed storage. |
| Pod D3 · Gym | about 33 m³ | Treadmill, cycle, flywheel resistive device; about 2.5 h per crew member per day. |
| Pod D4 · Greenhouse | about 33 m³ | Three-tier rack ring, about 20 m² of growing area est., part of about 60 m² across the base. A fresh-food supplement, not a full diet. |
| Pod D5 · Medical | about 33 m³ | Sick bay and lockable isolation room with its own WC and HEPA, on the stretcher route from EVA; each vestibule ramps the 0.3 m level change est. |
| Pod D6 · Workshop | about 33 m³ | 3D printers, spares, suit and robot repair, stowage. |
| EVA node | vault about 10.7 × 8.2 × 4.5 m | Catenary-arch dust porch, walk-through airlock and suitports26. |
| Rover dock | 1.27 m collar | Shirt-sleeve transfer to a pressurised rover27. |
| Rigid modules (beside the cluster) | lab about 128 m³ greenhouse about 30 m² | Laboratory that doubles as an independent safe haven; an EDEN ISS-class greenhouse module; a robot module with its own airlock. |
The hub vessel sits in a pit about 1 m deep. The shell's wall rises vertically for 3.31 m and then domes, so it keeps a 0.5 m vented gap around the whole vessel, shoulder included. All tunnel hatches open on the hub's lower, communal deck, a 0.3 m level change from the pod floors, so no one passes the cabins upstairs.
Section A–A through the hub, to scale (1 m = 34 units). Since 29 November 2026 the shell has vertical walls and a dome, so the vessel keeps a 0.5 m vented gap all round; the renders on this page show the earlier, rounder profile. Figures 1.75 m tall. The shell sits on its foundation ring, never on the vessel.
| Level | Elevation | Use | Floor |
|---|---|---|---|
| Private deck (upper) | +2.10 m | Six crew cabins with water-jacketed walls that double as the storm shelter; WC and shower; quiet nook. No through traffic: crew moving between the hub and pods stay on the deck below. | 35.3 m² at ≥2.5 m 47.9 m² at ≥2.0 m |
| Communal deck (lower) | −0.70 m | Galley, table for six, lounge with screen wall, ops and comms, second WC, racks. All tunnel hatches open here. As the full-height deck, it gives the shared rooms 2.5 m clear wall to wall. | about 42 m² net, 2.5 m clear |
| Floor areas are measured to the inner liner, about 0.15 m inside the vessel wall, and include the core. | |||
In orbit an inflatable needs multi-layer insulation and a micrometeoroid blanket. Under a regolith shell it needs neither, but it does sit in thin carbon dioxide, where MLI performs poorly. So the layup changes.
No micrometeoroid layer: the regolith shell does that job. The rigid life-support core and the hatches are the main penetrations through the soft goods.
hoop load N = p · r
at 56.5 kPa: 56.5 kPa × 4.35 m ≈ 246 kN/m
at 226 kPa: 226 kPa × 4.35 m ≈ 983 kN/m
Every metre of restraint around the cylinder carries about a quarter of a meganewton at working pressure, and is rated for four times that. A hemispherical end would carry half the cylinder's hoop load. Our 2.29 m cap is flatter: near its crown it carries about the cylinder's load, and near its rim the hoop direction goes slack, so the restraint there needs a shaped (isotensoid) strap pattern. The full paper sizes it.
A lower cabin pressure shortens the pre-breathe before a spacesuit EVA and lowers the load on every seal. At 56.5 kPa with 34% O₂ the oxygen partial pressure is 19.2 kPa, close to sea level on Earth. CO₂ is held at or below 0.40 kPa4,5. The price is fire risk: cabin materials must be qualified for 34% oxygen.
The shell is a sandwich: two 0.15 m skins of interlocking blocks, sintered in a kiln before placement, radial webs at most 1 m apart, a compacted regolith core, and an outer skin laser-sintered into a sealing glaze. Its wall rises vertically for 3.31 m and then domes; a ring beam at the wall head takes the dome's outward thrust. It stands on a foundation ring and works only in compression.
uplift on the hub 56.5 kPa × π × 4.35² ≈ 3.36 MN
weight of the shell ≈410 t × 3.71 m/s² ≈ 1.52 MN
regolith depth to balance 56.5 kPa:
p / (ρ g) = 56 500 / (1 700 × 3.71) ≈ 9.0 m
At Mars gravity the air pushes up more than twice as hard as a 1 m shell weighs down. Holding the pressure with dead weight would take about 9 m of regolith. So the fabric vessel carries all of the pressure, and the shell is designed as a shield.
1.0 m of sintered and compacted regolith at about 1.6–1.8 g/cm³ gives about 160–180 g/cm² of shielding est. Sintered regolith strengths in the literature vary about tenfold, from 11 to 348 MPa, so a test article is the first job (see Readiness).
Foundation rings are 2.0 m wide for the hub and 1.5 m for the pods, on footings at least 30 cm deep. A bearing check against lunar and Mars regolith data predicts 1–5 cm of settlement est.
Life support is rack-based, in the hub's rigid core, using ISS-heritage systems: water recovery, oxygen generation, CO₂ removal and reduction.
| Item | Value | Basis |
|---|---|---|
| Oxygen use | 0.895 kg / person / day | NASA BVAD Rev 218 |
| Potable water | about 3.2 kg / person / day | NASA BVAD Rev 218 |
| Food | 0.80 kg / person / day | NASA BVAD Rev 218 |
| Water recovery | 98% | ISS water recovery system, 202319 |
| Net habitable volume | ≥ 25 m³ / person | NASA HRP expert-consensus minimum for long missions6; CAIRN-7 is well above it |
| Plant growth | about 60 m² est. | Pod D4 rack ring about 20 m², corridor rack units about 10 m², rigid EDEN ISS-class greenhouse module about 30 m². Covers fresh salad and vegetables, not staples; stored food stays the baseline. EDEN ISS grew about 268 kg of food in Antarctica in 201828 |
| Breathing reserve and ascent oxidiser | solid-oxide electrolysis | MOXIE made 122 g of O₂ on Mars in 16 runs, peak 12 g/h20; a crew plant is about 165× larger |
| Return propellant | 22.7 t O₂ + 7.0 t CH₄ | From Mars water and CO₂ over about 480 days21; water mined from ground ice30 |
Oxygen-loop closure of 75% or more has not yet been shown; the ISS achieves about half. Spares and mean time between failures, 4–22 light-minutes from Earth, drive the design of the workshop pod.
One metre of regolith cuts the surface dose by about half near solar maximum. It does not bring a Mars mission inside today's career limit, and we do not claim it does.
Dashed line: NASA's 600 mSv career limit15. Surface rate from Curiosity RAD (about 0.64 mSv/day)13; transit about 1.8 mSv/day14; in-habitat range from Zhang et al.11 est., lower end near solar maximum. The surface figure is measured dose equivalent and the in-habitat figures are modelled effective dose, so the comparison is approximate.
Why a full metre. Galactic cosmic rays break up in the first layers of regolith and make secondary neutrons. Modelling by Zhang et al. shows the dose peaks at about 30 cm depth, so a thin cover is worse than none11; Röstel et al. find the same effect across a range of soils12. To stay at or below 100 mSv/yr, Zhang et al. need about 0.9–1.1 m near solar maximum but 1.5–1.6 m near solar minimum. So 1.0 m meets that mark only around solar maximum, and we budget about 100–150 mSv/yr across the cycle.
Solar storms. The private deck's cabin walls are water-jacketed to ≥25 g/cm² (15–20 t of water, filled from local ice), more than the extra 10 cm of water equivalent in crew quarters that NASA recommends15. Hydrogen-rich water stops solar protons with fewer secondaries than metal, and the same water is stored for use17.
The mission total stays above NASA's 600 mSv career limit even with the shell, mostly because of the journey there and back. CAIRN-7 reduces the surface share; it does not solve deep-space radiation.
Dust storms can cut sunlight for weeks; Opportunity was lost to one in 2018. So base power is fission, with solar and regenerative fuel cells as the second source.
| Source / load | Value |
|---|---|
| Fission surface power22,23 | 5 × 40 kWe (4 duty + 1 spare) |
| Siting | About 1 km out, 100–200 m apart, each in a 3–4 m pit with a berm est. |
| Solar array | about 2,400 m², tilted 35° south |
| Storage | about 2.5 MWh regenerative fuel cells est. |
| Steady-state base load | about 150 kW, about 180 kW with margin est. |
| Crew-critical load | about 80 kW, survives the loss of two units est. |
| Survival load, all fission lost | about 21 kW on solar and storage est. |
The reactor heritage is KRUSTY, which ran for 28 hours at full power in 201824. NASA's 2025 request for industry input looked at units of 100 kWe or more23; with larger units, CAIRN-7 would simply need fewer of them.
Solar output drops about 0.2% per sol from settling dust. Without cleaning, an array is down to roughly 37% after 500 sols, which is why panels are backup and not base load.
Ridgeline Six sits at 39.171° N, 195.604° E, on HiRISE image ESP_061075_2195, one of the areas imaged as a candidate for early Starship landings1.

The base is phased across launch windows, following the logic of NASA's Mars design reference architecture25: power, propellant and shelter are proven before anyone is committed to the surface.
On the NASA TRL scale, a system is no more mature than its least mature critical element. Heritage proven in orbit or on Earth is rated lower for the Mars surface until it has been tested in Mars-like conditions. Ratings are our assessment.
| Element | Heritage | TRL (LEO / Earth) | TRL (Mars surface) | Key risk |
|---|---|---|---|---|
| Regolith sandwich shell | ESA / Foster printed lunar shell study | 2 | 2 | No test article anywhere; sintering rate and power; cracking |
| Inflatable hub | BEAM, TransHab, Sierra LIFE | 6 | 4 | Deployment in dust; long-term creep; penetrations; flat-cap restraint pattern |
| Pods | BEAM (Ø 3.2 m class) | 9 | 4 | As the hub; water-jacket mass |
| Airlock / suitports | ISS Quest; Z-1 suitport tests | 9 / 4–5 | 6 / 4 | Dust on seals; recovering an injured crew member |
| Life support | ISS water recovery, OGA, CDRA | 9 | 5–6 | Closure, spares, reliability |
| Oxygen ISRU | MOXIE on Perseverance | 7 | 4–5 | About 165× scale-up; stack degradation |
| Water and methalox ISRU | Honeybee RedWater; ISS Sabatier | 5 | 3–4 | Ice access, liquefaction, power |
| Fission power | KRUSTY (2018) | 5 | 4 | Schedule; siting and exclusion zone |
| Solar and storage | MER, InSight, Perseverance arrays | 9 | 6 | Dust; global storms |
| Sintered landing pad | KSC / Masten LPAD tests (2020, reported 2021) | 3 | 2–3 | Erosion; build rate |
| Greenhouse | EDEN ISS, Veggie | 6 | 4–5 | About 50 kW average for about 60 m² (EDEN ISS scaling) est.; crew time |
Set by the regolith shell and the sintered pad. A near-term variant, with bagged regolith instead of sintered skins, an unprepared landing site at a distance and oxygen-only ISRU, would be about TRL 4. The first step we propose is a ground test article of the shell sandwich.
Figures marked est. or sum are MarsSurfHab's own estimates or arithmetic, with the working shown in our design records. Everything else is cited below. CAIRN-7 is a MarsSurfHab design concept; no space agency endorses or funds it.